Forum Settings
       
Reply To Thread

Please add this featureFollow

#1 Jun 30 2004 at 8:08 PM Rating: Decent
15 posts
I have an architect that charged per unit for the structured she makes. I was wondering if at all possible to get a total resource cost on the schematics? I see they are listed like:

200 metal
500 innert gas
847 chemical

For some of the larget structures, it's over 30,000 resources, and charging by the resource used, it would make a lot of people's lives easier if there was just a small list like "Total resources used: 10482."

Thanks for even considering this.

Swgcraft uses it, and it's simply invaluable to people like me.
#2 Jun 30 2004 at 9:05 PM Rating: Excellent
Spankatorium Administratix
Avatar
*****
1oooo posts
This was something I asked long ago, as I am an architect. I was told no. Sorry :(
____________________________

Reply To Thread

Colors Smileys Quote OriginalQuote Checked Help

 

Recent Visitors: 0 All times are in CDT